2026 Resurfacing - Main Street
The existing asphalt pavement on Main Street from Hannah Street to Victory Drive is in poor condition with fatigue cracking and pot holes present throughout. The utilities beneath the roadway were installed around the year 2000 and are constructed of modern materials. A resurfacing project will extend the useful life of the roadway and create a safe driving surface for the public. The scope of work is proposed as a full depth reclamation, ADA sidewalk improvements, spot curb & gutter replacement, and possible isolated storm drainage improvements. The project also includes reconstructing the access road to the City's Dolph Reservoir, located on the Minnesota State University Mankato campus at 710 Maywood Avenue.
Funding will come from a combination of local and state sources:
Loan/Bond Proceeds: $962,194
Special Assessments: $598,710
State Funding: $600,000
Stormwater Utility Revenue: $105,017
Water Utility Revenue: $182,844

Thank you for your contribution!
Help us reach out to more people in the community
Share this with family and friends